Modify my search
Listed three days ago

This is a Full time job

Wiri, Auckland(Hybrid)
  • Influence project success from day one
  • Exposure to major, nationally significant infrastructure projects
  • Backed by strong support, flexibility and global capability
  • Influence project success from day one
  • Exposure to major, nationally significant infrastructure projects
  • Backed by strong support, flexibility and global capability
This role is flexible on location.
This role is flexible on location.
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
3d ago
3d ago
Listed eight days ago

This is a Full time job

Tauranga Central, Bay of Plenty(Hybrid)
  • Get involved early – shape constructability, pricing and project set‑up
  • Grow your capability with strong front‑end exposure before site delivery
  • Tauranga based with supported transition from office to site
  • Get involved early – shape constructability, pricing and project set‑up
  • Grow your capability with strong front‑end exposure before site delivery
  • Tauranga based with supported transition from office to site
Front‑end focused Engineering Coordinator role for a Project Engineer keen on constructability, pricing and early project involvement in Tauranga.
Front‑end focused Engineering Coordinator role for a Project Engineer keen on constructability, pricing and early project involvement in Tauranga.
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
8d ago
8d ago
Listed twenty three days ago

This is a Full time job

Ellerslie, Auckland(Hybrid)
  • Excellent benefits including medical and life insurance
  • Supportive and collaborate team environment
  • Meaningful work for Auckland
  • Excellent benefits including medical and life insurance
  • Supportive and collaborate team environment
  • Meaningful work for Auckland
We have an exciting opportunity to make your mark on a large-scale road maintenance contract, as our Stormwater Asset Management Engineer.
We have an exciting opportunity to make your mark on a large-scale road maintenance contract, as our Stormwater Asset Management Engineer.
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
23d ago
23d ago
Listed twenty three days ago

Expiring soon

This is a Full time job

Wellington Central, Wellington(Hybrid)
$110k - $130k pa + bens, depending on experience
  • Central location, modern equipment, nice offices!
  • Bring on the job experience in water reticulation & surveying.
  • Strong focus on internal promotional opportunities.
  • Central location, modern equipment, nice offices!
  • Bring on the job experience in water reticulation & surveying.
  • Strong focus on internal promotional opportunities.
Unique opportunity with a tier 1 civil contractor to enjoy a 50/50 split across site-based survey work & project delivery responsibilities!
Unique opportunity with a tier 1 civil contractor to enjoy a 50/50 split across site-based survey work & project delivery responsibilities!
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
23d ago
23d ago
Listed five days ago
Civil Engineering Technician / Engineering Geologist Technician with CAD experience
Civil Engineering Technician / Engineering Geologist Technician with CAD experience
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
5d ago
5d ago
Listed two days ago

This is a Full time job

Hamilton Central, Waikato(Hybrid)
  • Are you someone who enjoys thinking beyond individual projects?
  • Newly created role offering an opportunity to contribute to long-term outcomes
  • Competitive remuneration + medical insurance + hybrid working
  • Are you someone who enjoys thinking beyond individual projects?
  • Newly created role offering an opportunity to contribute to long-term outcomes
  • Competitive remuneration + medical insurance + hybrid working
Play a key role in translating asset performance, demand, and risk into clear, evidence-based investment advice
Play a key role in translating asset performance, demand, and risk into clear, evidence-based investment advice
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
2d ago
2d ago
Listed seventeen days ago

at MDRS

This is a Full time job

Napier Central, Hawkes Bay(Hybrid)
  • Napier, Hawkes Bay based role for Junior Civil Engineer.
  • 12d or Civil 3D design software required. Ongoing training will be offered.
  • Market leading firm with offices throughout NZ.
  • Napier, Hawkes Bay based role for Junior Civil Engineer.
  • 12d or Civil 3D design software required. Ongoing training will be offered.
  • Market leading firm with offices throughout NZ.
Junior Civil Engineer role based in beautiful Napier - Hawkes Bay. Looking for a change of scene? Relocation assistance offered.
Junior Civil Engineer role based in beautiful Napier - Hawkes Bay. Looking for a change of scene? Relocation assistance offered.
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
17d ago
17d ago
Listed nine days ago

This is a Full time job

Dunedin Central, Otago(Hybrid)
$85k | Vehicle | 6% KiwiSaver | Medical cover
  • Large-scale infrastructure business with long-term career pathways
  • Hands-on site exposure across a veirty of different projects
  • Must be a qualified engineer | 1-3yrs xperience valued though not necessary
  • Large-scale infrastructure business with long-term career pathways
  • Hands-on site exposure across a veirty of different projects
  • Must be a qualified engineer | 1-3yrs xperience valued though not necessary
Build your engineering career with a major infrastructure contractor delivering long-term 3 waters projects, stability & career progression!
Build your engineering career with a major infrastructure contractor delivering long-term 3 waters projects, stability & career progression!
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
9d ago
9d ago
Listed one day ago

Be an early applicant

This is a Full time job

Auckland CBD, Auckland(Hybrid)
  • Lead high-impact transport projects shaping New Zealand’s future
  • Drive innovation in stormwater design with top industry experts
  • Grow your career with global opportunities and strong support
  • Lead high-impact transport projects shaping New Zealand’s future
  • Drive innovation in stormwater design with top industry experts
  • Grow your career with global opportunities and strong support
Lead game-changing transport projects and shape NZ’s future with innovative stormwater design, technical leadership, and real impact.
Lead game-changing transport projects and shape NZ’s future with innovative stormwater design, technical leadership, and real impact.
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
1d ago
1d ago
Listed four days ago

This is a Full time job

Christchurch Central, Canterbury(Hybrid)
  • Design large residential subdivision projects using 12d
  • Take projects from concept through to detailed design and council approvals
  • Work with a team delivering high-quality land development projects
  • Design large residential subdivision projects using 12d
  • Take projects from concept through to detailed design and council approvals
  • Work with a team delivering high-quality land development projects
Join a well-regarded land development consultancy delivering subdivision and infrastructure projects. Design-focused role using 12d.
Join a well-regarded land development consultancy delivering subdivision and infrastructure projects. Design-focused role using 12d.
Recruited byStephen Smith
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
4d ago
4d ago
Listed eight days ago

at MDRS

This is a Full time job

Auckland CBD, Auckland(Hybrid)
$90,000 – $110,000 per year
  • Leading NZ owned design and project management consultancy.
  • One role available in each office - Auckland and Christchurch.
  • 5 years of NZ based experience required for both roles.
  • Leading NZ owned design and project management consultancy.
  • One role available in each office - Auckland and Christchurch.
  • 5 years of NZ based experience required for both roles.
2 brand new Civil Engineer roles. 1 role based in Auckland and 1 role based in Christchurch for this leading consulting and project management firm.
2 brand new Civil Engineer roles. 1 role based in Auckland and 1 role based in Christchurch for this leading consulting and project management firm.
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
8d ago
8d ago
Listed ten days ago

This is a Full time job

Auckland(Hybrid)
Insurance, Kiwisaver, fuel discounts + Benefits
  • Good Career, Good Work, Good Life, Good Perks
  • Work for one of NZ's largest Civil Contractors!
  • Auckland or Christchurch location!
  • Good Career, Good Work, Good Life, Good Perks
  • Work for one of NZ's largest Civil Contractors!
  • Auckland or Christchurch location!
Join our Technical team and bring your temporary works expertise to meaningful work!
Join our Technical team and bring your temporary works expertise to meaningful work!
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
10d ago
10d ago
Listed sixteen days ago

This is a Full time job

Christchurch Central, Canterbury(Hybrid)
  • Flexible Working Arrangements
  • Competitive Salary
  • On-the-Job coaching and training
  • Flexible Working Arrangements
  • Competitive Salary
  • On-the-Job coaching and training
Exciting opportunity for a structural engineer to join our Christchurch team.
Exciting opportunity for a structural engineer to join our Christchurch team.
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
16d ago
16d ago
Listed eight days ago

This is a Full time job

Auckland CBD, Auckland(Hybrid)
  • Flexible working arrangements aimed at achieving real work life balance
  • Competitive remuneration
  • Modern, collaborative offices that encourage connection, creativity, wellbeing
  • Flexible working arrangements aimed at achieving real work life balance
  • Competitive remuneration
  • Modern, collaborative offices that encourage connection, creativity, wellbeing
Due to new project wins we are on the need for a Senior Bridge/Civil Structures Engineer.
Due to new project wins we are on the need for a Senior Bridge/Civil Structures Engineer.
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
8d ago
8d ago
Listed eight days ago

This is a Full time job

Wanaka, Otago(Hybrid)
130k plus relative to experience
  • Nelson or Wānaka-based role with hybrid flexibility
  • Diverse civil & infrastructure projects (3-waters, land development, commercial)
  • Strong technical team + mentoring toward CPEng
  • Nelson or Wānaka-based role with hybrid flexibility
  • Diverse civil & infrastructure projects (3-waters, land development, commercial)
  • Strong technical team + mentoring toward CPEng
Intermediate to Senior Civil Engineer Leading New Zealand civil & infrastructure consultancy Nelson or Wānaka - Structured hybrid worki
Intermediate to Senior Civil Engineer Leading New Zealand civil & infrastructure consultancy Nelson or Wānaka - Structured hybrid worki
Recruited byGreg Small
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
8d ago
8d ago
Listed more than thirty days ago

Expiring soon

This is a Full time job

East Tamaki, Auckland(Hybrid)
Join SENZ and shape NZ’s built environment - lead projects, grow your skills, and make a real impact in a thriving, client-focused consultancy.
Join SENZ and shape NZ’s built environment - lead projects, grow your skills, and make a real impact in a thriving, client-focused consultancy.
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
30d+ ago
30d+ ago
Listed eleven days ago

This is a Full time job

Auckland CBD, Auckland(Hybrid)
  • Lead major transport infrastructure and bridge projects across New Zealand
  • Strong pipeline of complex highways, structures and public sector work
  • Clear career progression with leadership and mentoring opportunities
  • Lead major transport infrastructure and bridge projects across New Zealand
  • Strong pipeline of complex highways, structures and public sector work
  • Clear career progression with leadership and mentoring opportunities
Lead major transport infrastructure projects across NZ, delivering structural design, mentoring teams, and driving client success.
Lead major transport infrastructure projects across NZ, delivering structural design, mentoring teams, and driving client success.
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
11d ago
11d ago
Listed eight days ago

Be an early applicant

This is a Full time job

Nelson Central, Tasman(Hybrid)
130k plus relative to experience
  • Nelson or Wānaka-based role with hybrid flexibility
  • Diverse civil & infrastructure projects (3-waters, land development, commercial)
  • Strong technical team + mentoring toward CPEng
  • Nelson or Wānaka-based role with hybrid flexibility
  • Diverse civil & infrastructure projects (3-waters, land development, commercial)
  • Strong technical team + mentoring toward CPEng
Intermediate to Senior Civil Engineer Leading New Zealand civil & infrastructure consultancy Nelson or Wānaka - Structured hybrid worki
Intermediate to Senior Civil Engineer Leading New Zealand civil & infrastructure consultancy Nelson or Wānaka - Structured hybrid worki
Recruited byGreg Small
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
8d ago
8d ago
Listed fifteen days ago

This is a Full time job

Auckland CBD, Auckland(Hybrid)
  • Create - Nationally Recognised team in the Medium Density Engineering space
  • Inspire - Lots of growth and potential to expand into different areas
  • Grow - your career with us - let us help you be the best you can be!
  • Create - Nationally Recognised team in the Medium Density Engineering space
  • Inspire - Lots of growth and potential to expand into different areas
  • Grow - your career with us - let us help you be the best you can be!
Open to relocating to Brisbane? Ready to step up to your next challenge? Come play a pivotal part in helping grow and shape our team.
Open to relocating to Brisbane? Ready to step up to your next challenge? Come play a pivotal part in helping grow and shape our team.
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
15d ago
15d ago
Listed twenty nine days ago

Expiring soon

This is a Full time job

Christchurch, Canterbury(Hybrid)
$120,000 – $150,000 per year
  • 8+ years NZ consulting experience in Civil Engineering & Project Management
  • Completive hourly rate with overtime paid!
  • Top quality flexible culture and solid reputation in the industry
  • 8+ years NZ consulting experience in Civil Engineering & Project Management
  • Completive hourly rate with overtime paid!
  • Top quality flexible culture and solid reputation in the industry
Senior Civil Engineer wanted – drive land development & subdivision delivery with long-term greenfield projects already underway!
Senior Civil Engineer wanted – drive land development & subdivision delivery with long-term greenfield projects already underway!
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
29d ago
29d ago
Listed seventeen days ago

This is a Full time job

Christchurch Central, Canterbury(Hybrid)
Take the lead on structural projects, support team development, and grow your technical expertise within Enovate’s dynamic environment.
Take the lead on structural projects, support team development, and grow your technical expertise within Enovate’s dynamic environment.
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
17d ago
17d ago
Listed eight days ago

Be an early applicant

This is a Full time job

Auckland CBD, Auckland(Hybrid)
  • Influence strategy, clients, and technical excellence
  • Lead major flood modelling projects with national impact
  • Mentor teams while growing a strong market presence
  • Influence strategy, clients, and technical excellence
  • Lead major flood modelling projects with national impact
  • Mentor teams while growing a strong market presence
Lead cutting-edge flood modelling projects, shape resilient communities, and drive technical excellence while growing client impact across New Zealand
Lead cutting-edge flood modelling projects, shape resilient communities, and drive technical excellence while growing client impact across New Zealand
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
8d ago
8d ago
Listed twenty four days ago

Expiring soon

This is a Full time job

Auckland CBD, Auckland(Hybrid)
NZD 140000 - 170000 per annum, Sign-on-bonus +
  • Clear Career Progression Pathways + On The Job Learning at All Levels
  • Annual Remuneration Review + Laptop & Mobile + Carpark + Profit Share
  • Exposure To Large Scale Projects + Variety
  • Clear Career Progression Pathways + On The Job Learning at All Levels
  • Annual Remuneration Review + Laptop & Mobile + Carpark + Profit Share
  • Exposure To Large Scale Projects + Variety
Step into a leadership role with a forward-thinking, multi-disciplinary
Step into a leadership role with a forward-thinking, multi-disciplinary
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
24d ago
24d ago
Listed eight days ago

This is a Full time job

Wellington Central, Wellington(Hybrid)
Salary, Benefits, Mentoring, & Hybrid Working
  • Ongoing, challenging work, lots of mentoring and career development
  • Variety of project work, including transportation and civil infrastructure
  • Great office culture with a strong social club
  • Ongoing, challenging work, lots of mentoring and career development
  • Variety of project work, including transportation and civil infrastructure
  • Great office culture with a strong social club
Work on impactful transport & water infrastructure projects, applying geotechnical expertise across investigations, design, construction, & advisory.
Work on impactful transport & water infrastructure projects, applying geotechnical expertise across investigations, design, construction, & advisory.
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
8d ago
8d ago
Listed twenty nine days ago

Expiring soon

This is a Full time job

Rodney & North Shore, Auckland(Hybrid)
$70,000 – $90,000 per year
  • 2+ Years NZ based consulting experience required
  • Parking costs reimbursed by the company!
  • Residential focused consultant with an exciting 5 year strategic growth plan
  • 2+ Years NZ based consulting experience required
  • Parking costs reimbursed by the company!
  • Residential focused consultant with an exciting 5 year strategic growth plan
Junior / Intermediate geotechnical engineer or Geologist required | North Shore consultancy | geotech, stormwater & wastewater projects | Growth role!
Junior / Intermediate geotechnical engineer or Geologist required | North Shore consultancy | geotech, stormwater & wastewater projects | Growth role!
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
29d ago
29d ago
Listed eleven days ago

at Egis

This is a Full time job

Wellington Central, Wellington(Hybrid)
  • Attractive salary package compared to the market
  • Flexible work arrangements
  • Work on innovative, technically complex projects locally and nationally!
  • Attractive salary package compared to the market
  • Flexible work arrangements
  • Work on innovative, technically complex projects locally and nationally!
We are hiring for multiple roles at Intermediate to Senior levels to grow our Transport team in Aotearoa, based out of Wellington.
We are hiring for multiple roles at Intermediate to Senior levels to grow our Transport team in Aotearoa, based out of Wellington.
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
11d ago
11d ago
Listed two days ago

Be an early applicant

This is a Full time job

Napier Central, Hawkes Bay(Hybrid)
  • Leadership role with scope to shape strategy, clients, and regional growth
  • Work with planners, water, and environmental specialists on integrated projects
  • Flexible working and competitive benefits in a stunning lifestyle region
  • Leadership role with scope to shape strategy, clients, and regional growth
  • Work with planners, water, and environmental specialists on integrated projects
  • Flexible working and competitive benefits in a stunning lifestyle region
Lead and grow geotechnical impact across the region with a respected, employee-owned consultancy shaping New Zealand’s infrastructure and communities.
Lead and grow geotechnical impact across the region with a respected, employee-owned consultancy shaping New Zealand’s infrastructure and communities.
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
2d ago
2d ago
Listed twenty nine days ago

at HERA
Expiring soon

This is a Full time job

Manukau, Auckland(Hybrid)
$110,000 – $150,000 per year
  • Diverse team
  • Flexible working arrangements, including remote work opportunities
  • Professional development training
  • Diverse team
  • Flexible working arrangements, including remote work opportunities
  • Professional development training
Growing organisation seeking a Senior Welding Engineer to contribute to industry education and innovation.
Growing organisation seeking a Senior Welding Engineer to contribute to industry education and innovation.
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
29d ago
29d ago
Listed fifteen days ago

This is a Full time job

Auckland(Hybrid)
Insurance, Kiwisaver + Benefits
  • Good Career, Good Work, Good Life, Good Perks
  • Work for one of NZ's largest Civil Contractors!
  • Bring your Geotech expertise to some exciting work!
  • Good Career, Good Work, Good Life, Good Perks
  • Work for one of NZ's largest Civil Contractors!
  • Bring your Geotech expertise to some exciting work!
This role can be based anywhere in NZ, with a preference for Auckland or Christchurch. Bring your Geotech expertise to our technical team!
This role can be based anywhere in NZ, with a preference for Auckland or Christchurch. Bring your Geotech expertise to our technical team!
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
15d ago
15d ago
Listed twenty four days ago

Expiring soon

This is a Full time job

Auckland CBD, Auckland(Hybrid)
  • Grow - Your career with access to continuous learning opportunities
  • Inspire - Use technical expertise and leadership to help shape the future
  • Create - Cutting edge projects that help develop of local communities
  • Grow - Your career with access to continuous learning opportunities
  • Inspire - Use technical expertise and leadership to help shape the future
  • Create - Cutting edge projects that help develop of local communities
Join Intrax as a Civil Engineer! Work on residential development projects in SA within a multidisciplinary consultancy. Open to candidates relocating.
Join Intrax as a Civil Engineer! Work on residential development projects in SA within a multidisciplinary consultancy. Open to candidates relocating.
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
24d ago
24d ago
Listed nine days ago

This is a Full time job

Auckland CBD, Auckland(Hybrid)
  • Work on high-profile heritage and existing building upgrades
  • Blend design, assessment, and hands-on construction monitoring
  • Be part of a highly regarded structural strengthening team
  • Work on high-profile heritage and existing building upgrades
  • Blend design, assessment, and hands-on construction monitoring
  • Be part of a highly regarded structural strengthening team
Join a specialist consultancy delivering complex seismic strengthening and retrofit projects across New Zealand's built environment.
Join a specialist consultancy delivering complex seismic strengthening and retrofit projects across New Zealand's built environment.
Recruited byStephen Smith
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
9d ago
9d ago
Listed twenty three days ago

This is a Full time job

Auckland CBD, Auckland(Hybrid)
Join a leading structural practice in Auckland or Tauranga. Lead innovative large-scale commercial and timber projects in a flexible, expert team.
Join a leading structural practice in Auckland or Tauranga. Lead innovative large-scale commercial and timber projects in a flexible, expert team.
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
23d ago
23d ago
Modify my search
How relevant are your results?

Receive new jobs for this search by email

Return to search results
Modify my search

Select a job

Display details here