Modify my search
Listed four days ago

This is a Full time job

Wiri, Auckland(Hybrid)
  • Influence project success from day one
  • Exposure to major, nationally significant infrastructure projects
  • Backed by strong support, flexibility and global capability
  • Influence project success from day one
  • Exposure to major, nationally significant infrastructure projects
  • Backed by strong support, flexibility and global capability
This role is flexible on location.
This role is flexible on location.
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
4d ago
4d ago
Listed one day ago

Be an early applicant

This is a Full time job

Auckland CBD, Auckland(Hybrid)
  • Lead high-impact transport projects shaping New Zealand’s future
  • Drive innovation in stormwater design with top industry experts
  • Grow your career with global opportunities and strong support
  • Lead high-impact transport projects shaping New Zealand’s future
  • Drive innovation in stormwater design with top industry experts
  • Grow your career with global opportunities and strong support
Lead game-changing transport projects and shape NZ’s future with innovative stormwater design, technical leadership, and real impact.
Lead game-changing transport projects and shape NZ’s future with innovative stormwater design, technical leadership, and real impact.
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
1d ago
1d ago
Listed twenty three days ago

This is a Full time job

Ellerslie, Auckland(Hybrid)
  • Excellent benefits including medical and life insurance
  • Supportive and collaborate team environment
  • Meaningful work for Auckland
  • Excellent benefits including medical and life insurance
  • Supportive and collaborate team environment
  • Meaningful work for Auckland
We have an exciting opportunity to make your mark on a large-scale road maintenance contract, as our Stormwater Asset Management Engineer.
We have an exciting opportunity to make your mark on a large-scale road maintenance contract, as our Stormwater Asset Management Engineer.
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
23d ago
23d ago
Listed nine days ago

at MDRS

This is a Full time job

Auckland CBD, Auckland(Hybrid)
$90,000 – $110,000 per year
  • Leading NZ owned design and project management consultancy.
  • One role available in each office - Auckland and Christchurch.
  • 5 years of NZ based experience required for both roles.
  • Leading NZ owned design and project management consultancy.
  • One role available in each office - Auckland and Christchurch.
  • 5 years of NZ based experience required for both roles.
2 brand new Civil Engineer roles. 1 role based in Auckland and 1 role based in Christchurch for this leading consulting and project management firm.
2 brand new Civil Engineer roles. 1 role based in Auckland and 1 role based in Christchurch for this leading consulting and project management firm.
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
9d ago
9d ago
Listed nine days ago

This is a Full time job

Auckland CBD, Auckland(Hybrid)
  • Flexible working arrangements aimed at achieving real work life balance
  • Competitive remuneration
  • Modern, collaborative offices that encourage connection, creativity, wellbeing
  • Flexible working arrangements aimed at achieving real work life balance
  • Competitive remuneration
  • Modern, collaborative offices that encourage connection, creativity, wellbeing
Due to new project wins we are on the need for a Senior Bridge/Civil Structures Engineer.
Due to new project wins we are on the need for a Senior Bridge/Civil Structures Engineer.
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
9d ago
9d ago
Listed fifteen days ago

This is a Full time job

Auckland CBD, Auckland(Hybrid)
  • Create - Nationally Recognised team in the Medium Density Engineering space
  • Inspire - Lots of growth and potential to expand into different areas
  • Grow - your career with us - let us help you be the best you can be!
  • Create - Nationally Recognised team in the Medium Density Engineering space
  • Inspire - Lots of growth and potential to expand into different areas
  • Grow - your career with us - let us help you be the best you can be!
Open to relocating to Brisbane? Ready to step up to your next challenge? Come play a pivotal part in helping grow and shape our team.
Open to relocating to Brisbane? Ready to step up to your next challenge? Come play a pivotal part in helping grow and shape our team.
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
15d ago
15d ago
Listed twelve days ago

This is a Full time job

Auckland CBD, Auckland(Hybrid)
  • Lead major transport infrastructure and bridge projects across New Zealand
  • Strong pipeline of complex highways, structures and public sector work
  • Clear career progression with leadership and mentoring opportunities
  • Lead major transport infrastructure and bridge projects across New Zealand
  • Strong pipeline of complex highways, structures and public sector work
  • Clear career progression with leadership and mentoring opportunities
Lead major transport infrastructure projects across NZ, delivering structural design, mentoring teams, and driving client success.
Lead major transport infrastructure projects across NZ, delivering structural design, mentoring teams, and driving client success.
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
12d ago
12d ago
Listed nine days ago

Be an early applicant

This is a Full time job

Auckland CBD, Auckland(Hybrid)
  • Influence strategy, clients, and technical excellence
  • Lead major flood modelling projects with national impact
  • Mentor teams while growing a strong market presence
  • Influence strategy, clients, and technical excellence
  • Lead major flood modelling projects with national impact
  • Mentor teams while growing a strong market presence
Lead cutting-edge flood modelling projects, shape resilient communities, and drive technical excellence while growing client impact across New Zealand
Lead cutting-edge flood modelling projects, shape resilient communities, and drive technical excellence while growing client impact across New Zealand
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
9d ago
9d ago
Listed twenty three days ago

This is a Full time job

Auckland CBD, Auckland(Hybrid)
Join a leading structural practice in Auckland or Tauranga. Lead innovative large-scale commercial and timber projects in a flexible, expert team.
Join a leading structural practice in Auckland or Tauranga. Lead innovative large-scale commercial and timber projects in a flexible, expert team.
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
23d ago
23d ago
Listed nine days ago

This is a Full time job

Auckland CBD, Auckland(Hybrid)
  • Work on high-profile heritage and existing building upgrades
  • Blend design, assessment, and hands-on construction monitoring
  • Be part of a highly regarded structural strengthening team
  • Work on high-profile heritage and existing building upgrades
  • Blend design, assessment, and hands-on construction monitoring
  • Be part of a highly regarded structural strengthening team
Join a specialist consultancy delivering complex seismic strengthening and retrofit projects across New Zealand's built environment.
Join a specialist consultancy delivering complex seismic strengthening and retrofit projects across New Zealand's built environment.
Recruited byStephen Smith
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
9d ago
9d ago
Listed twenty four days ago

Expiring soon

This is a Full time job

Auckland CBD, Auckland(Hybrid)
NZD 140000 - 170000 per annum, Sign-on-bonus +
  • Clear Career Progression Pathways + On The Job Learning at All Levels
  • Annual Remuneration Review + Laptop & Mobile + Carpark + Profit Share
  • Exposure To Large Scale Projects + Variety
  • Clear Career Progression Pathways + On The Job Learning at All Levels
  • Annual Remuneration Review + Laptop & Mobile + Carpark + Profit Share
  • Exposure To Large Scale Projects + Variety
Step into a leadership role with a forward-thinking, multi-disciplinary
Step into a leadership role with a forward-thinking, multi-disciplinary
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
24d ago
24d ago
Listed more than thirty days ago

Expiring soon

This is a Full time job

East Tamaki, Auckland(Hybrid)
Join SENZ and shape NZ’s built environment - lead projects, grow your skills, and make a real impact in a thriving, client-focused consultancy.
Join SENZ and shape NZ’s built environment - lead projects, grow your skills, and make a real impact in a thriving, client-focused consultancy.
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
30d+ ago
30d+ ago
Listed twenty four days ago

Expiring soon

This is a Full time job

Auckland CBD, Auckland(Hybrid)
  • Grow - Your career with access to continuous learning opportunities
  • Inspire - Use technical expertise and leadership to help shape the future
  • Create - Cutting edge projects that help develop of local communities
  • Grow - Your career with access to continuous learning opportunities
  • Inspire - Use technical expertise and leadership to help shape the future
  • Create - Cutting edge projects that help develop of local communities
Join Intrax as a Civil Engineer! Work on residential development projects in SA within a multidisciplinary consultancy. Open to candidates relocating.
Join Intrax as a Civil Engineer! Work on residential development projects in SA within a multidisciplinary consultancy. Open to candidates relocating.
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
24d ago
24d ago
Listed more than thirty days ago

at HERA
Expiring soon

This is a Full time job

Manukau, Auckland(Hybrid)
$110,000 – $150,000 per year
  • Diverse team
  • Flexible working arrangements, including remote work opportunities
  • Professional development training
  • Diverse team
  • Flexible working arrangements, including remote work opportunities
  • Professional development training
Growing organisation seeking a Senior Welding Engineer to contribute to industry education and innovation.
Growing organisation seeking a Senior Welding Engineer to contribute to industry education and innovation.
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
30d+ ago
30d+ ago
Listed twenty four days ago

Expiring soon

This is a Full time job

Auckland CBD, Auckland(Hybrid)
NZD 1400000 - 1600000 per annum, Vehicle + Profit
  • Profit-share and equity pathway
  • influence without large-corporate bureaucracy
  • Flexible working arrangements and trusted autonomy
  • Profit-share and equity pathway
  • influence without large-corporate bureaucracy
  • Flexible working arrangements and trusted autonomy
Opportunity to take a leading role in growing the civil engineering service line, supported by an experienced and supportive leadership team.
Opportunity to take a leading role in growing the civil engineering service line, supported by an experienced and supportive leadership team.
subClassification: Civil/Structural EngineeringCivil/Structural Engineering
classification: Engineering(Engineering)
24d ago
24d ago
Modify my search
How relevant are your results?

Receive new jobs for this search by email

Return to search results
Modify my search

Select a job

Display details here